Alongside the people who look after listed property
Listed Buildings raise questions most property professionals cannot answer alone. We give you and your clients a clear answer, a real cost and a team that can do the work.

For homeowners
In a listed home, a new window, a repair or a change to the services can all raise a question about consent. Usually that means an architect for the drawings, a separate contractor for the work, and you coordinating between them. We do both. We tell you whether permission is needed, prepare and submit any applications, and carry out the work, as one team with one point of contact.
How it works: we visit and assess your home, advise on what needs consent, prepare the drawings and applications, and plan the works alongside them. Once consent is in place, we carry out the work.
For homeowners · Ongoing maintenance
Historic homes stay in good condition when small problems are caught early. We offer ongoing maintenance for listed and period homes: regular assessments of the building's condition, a clear, prioritised list of what needs attention, and the contractor to carry it out. You have a team who knows your home, keeps a record of its condition and handles any consents, so looking after it becomes routine rather than a series of emergencies.
How it works: we carry out an initial condition assessment, agree a maintenance plan with you, revisit at regular intervals to check the building, and arrange any repairs or works, including consent where it is needed.

For building owners
Whether you own a residential block, a commercial building or a mixed-use property, keeping a historic building in good order means balancing repairs, compliance and consents, often with tenants in occupation. We assess the building, set out what needs doing and when, secure the consents and carry out the works, so maintenance is planned rather than reactive.
How it works: we carry out a building maintenance assessment, prioritise the works into a long-term plan, prepare specifications and any applications, including Section 20 packages for blocks, and deliver the works in stages to suit you.

For estate agents
The buyer's survey on a listed property comes back with defects. The surveyor's figure is a worst case, the seller thinks it is being used to chip the price, and the chain starts to wobble. We provide an independent, costed report so both sides can agree what the work will really cost and get back to completion. If the buyer wants the work done, we can carry it out after completion so the property is sorted before they move in.
Our report stands on its own: a neutral figure for both parties, whether or not we go on to do the work.
How it works: we review the buyer's survey, visit the property, assess the works, and set out a solution with a cost estimate for professional fees and the works. If the buyer wishes, we arrange the works ahead of move-in.

For building surveyors
Your Level 3 survey on a listed property flags the problems. Then the client asks what it will cost and who can put it right. We turn your findings into a properly costed scope of works, prepared by a heritage Architect and a contractor together. Your client gets a clear answer, and you have a specialist you can recommend with confidence.
How it works: we review your survey report, visit the property, assess the works required, and set out a solution with a cost estimate for professional fees and the works. If instructed, we arrange for the works to be carried out.

For solicitors and conveyancers
You need to know whether past alterations were properly consented and whether your client's plans will need consent. Flag too much and a sound deal stalls. Flag too little and your client inherits an enforcement risk. We check the property against its planning history, identify any unauthorised works or missing consents, and advise on what proposed works would need.
How it works: we review the title and planning history, check for unauthorised alterations or missing Listed Building consent, advise on consent for the buyer's plans, and provide a report you can pass straight to your client.

For landlords and managing agents
From October 2030, private rental properties must reach EPC C or better, and since January 2026 Listed Buildings are no longer exempt. Many retrofit firms will not touch traditional buildings. We assess listed and period properties for the measures needed to reach EPC C within the government's cost cap, protecting the historic fabric and steering clear of works that would struggle to get consent. We can then manage the work for landlords who are not hands-on.
How it works: we review the EPC rating and construction, assess measures within the cost cap, advise on Listed Building consent and other approvals, and set out a solution with costs for professional fees and the works. If instructed, we arrange the works.